Home / Solutions / Hotel EV Charging
Turn EV charging from a guest complaint into a booking driver. Branded, silent, and seamlessly integrated with your property management system — at every star level.
Challenges
22% of premium hotel guests say EV charging availability influences their booking decision. Properties without adequate charging are losing high-value guests to competitors who have invested — especially in markets where EV adoption exceeds 30% of new car sales.
Guests arriving with low battery after long drives need reliable, easy-to-use chargers — not confusing third-party apps, broken units, or valet-managed workarounds that create negative TripAdvisor reviews.
Standard industrial chargers clash with luxury property design. Five-star hotels need charging equipment that matches their architectural standards — clean lines, premium finishes, and branded interfaces that reinforce, not undermine, the guest experience.
Unmanaged EV charging during peak periods (guest check-in, event arrivals) can spike demand charges by 2-3×. Without OCPP load balancing, a hotel can pay more for electricity than it earns from charging fees.
Guests expect EV charging to appear on their room folio — not a separate app or payment terminal. Integrating charger billing with your PMS (Opera, Fidelio, etc.) via OCPP is essential for a seamless guest journey.
Overnight guests need AC Level 2 charging (6-8 hour dwell time). Day visitors and event attendees need DC fast charging (30-45 minutes). A single charger type cannot serve both — the right mix of AC and DC is critical.
Equipment
Our hospitality charging solutions are designed to be seen by guests — not heard. Silent operation, premium enclosures, and fully branded interfaces that integrate with your property's guest experience.
Best for overnight guest parking
AC charging pile for hotel guest parking and valet areas, available in 7 kW, 11 kW and 22 kW. IP65 outdoor enclosure, 4.3-inch display with RFID card, Bluetooth app and Plug & Charge authentication, and OCPP management. Ideal for overnight guest charging.
Deploy 1 unit per guest parking bay, or share via dual-gun build
View 7–22 kW AC Charging Pile specificationsFor valet & visitor fast charging
Floor-standing DC fast charger for valet parking, visitor areas, and event guests. 60–80 kW with adaptive DC 200–1,000 V output, a 10-inch display with QR code, RFID card, password and VIN startup, and 4G/Ethernet connectivity. IP54 enclosure rated -20 °C to +55 °C for outdoor and semi-enclosed hotel parking.
Deploy 1–3 units at valet/drop-off zone
View 60–80 kW DC Charging Pile specificationsProven Results
"The branded interface on the charger screen was essential — our guests see the Landmark Hospitality logo, a welcome message in Arabic or English, and their room number. It feels like part of the hotel, not third-party equipment." — Engineering Director, Landmark Hospitality Group
Read Full Case Study →96%
Guest Satisfaction
Up from 41% pre-installation
210+
Sessions/Week
31%
Energy Cost Saving
38
Month Payback
Investment Returns
Hotel EV charging generates revenue through three channels: direct charging fees, increased guest bookings, and extended dwell time for F&B and spa revenue. Conservative estimates below based on real deployments.
20–50 rooms, limited parking
6× AC 7kW Vertical + 1× DC 60kW
$12,000 – $18,000
$8,500 – $14,000/year
18–24 months
100–200 rooms, conference facilities
20× AC 7kW Vertical + 3× DC 80kW
$40,000 – $65,000
$28,000 – $45,000/year
20–28 months
200+ rooms, multiple F&B outlets, spa
40× AC 7kW Vertical + 6× DC 80kW
$85,000 – $130,000
$65,000 – $95,000/year
18–26 months
Hardware
Quiet, branded charging for guests — from overnight AC charging piles to daytime DC fast charging.
Hotel EV Charging
7–22 kW
AC charger for hotel guest parking and valet areas.
View Product →Hotel EV Charging
60–80 kW
Daytime fast charging for resort and business hotel guests.
View Product →Guides
Related Guide
Commercial EV Charger Guide: Types, Costs and How to Choose
Read the commercial charger guide →Related Guide
EV Charging Station Installation Cost: Complete Guide
Read the installation cost guide →Related Guide
Regional EV Charger Funding: 2026 Global Guide
Read the charger funding guide →Tell us about your property — number of rooms, parking capacity, and target guest profile. We'll design a charging solution that matches your brand and budget, with PMS integration options.