Home / Projects

Project Case Studies

Real-world EV charging deployments across four continents — documented with installation details, charger specifications, and independently verified performance results.

Accra Fleet DC Fast-Charging Hub, Ghana
🇬🇭
Logistics & Fleet West Africa · Ghana

Accra Fleet DC Fast-Charging Hub, Ghana

A Ghanaian fleet operator deployed six 240 kW DC chargers in Accra, cutting charge time to 42 minutes and boosting fleet availability by 30%.

6× 240 kW Dual-Gun DC Fast Charging Pile

Key Result

30% increase in fleet availability, 20% reduction in per-km energy cost, zero equipment failures over 8 months

Timeline

38 days from site survey to commissioning

Read Case Study
CityPark Shopping EV Charging, Amsterdam
🇳🇱
Retail Real Estate Europe · Netherlands

CityPark Shopping EV Charging, Amsterdam

A Dutch retail operator deployed 40 smart 22 kW AC chargers at two Amsterdam centres, recording 340+ daily sessions and 19% longer shopper dwell time.

40× 22 kW AC Level 2 Charging Pile

Key Result

340+ peak-day sessions · 19% dwell time increase · tenant lease renewal contribution

Timeline

Q2 2024 · 12 weeks including tenant consultation

Read Case Study
Landmark Hospitality EV Charging, Dubai
🇦🇪
Hospitality Middle East · United Arab Emirates

Landmark Hospitality EV Charging, Dubai

A Dubai luxury hotel operator deployed 34 chargers across three properties, achieving 96% guest satisfaction through smart load-balanced EV charging.

30× 22 kW AC Level 2 Wall Box 4× 60–80 kW DC Charging Pile

Key Result

96% guest satisfaction · 210+ sessions/week · 31% energy cost saving via load balancing

Timeline

Q1 2024 · 6 weeks installation across 3 properties

Read Case Study
BrightRoute Fleet Depot Charging, Bangkok
🇹🇭
Logistics & Fleet Southeast Asia · Thailand

BrightRoute Fleet Depot Charging, Bangkok

A Thai logistics operator electrified its Bangkok depot with 56 chargers, cutting energy costs 38% and achieving 99.1% uptime in the first eight months.

48× 7 kW AC Charging Pile 8× 20–40 kW DC Charging Pile

Key Result

99.1% uptime · 38% energy cost reduction · 1,440+ sessions/week

Timeline

Q4 2023 · 8 weeks from order to full commissioning

Read Case Study
A9 Autobahn Fast-Charging Hub, Bavaria
🇩🇪
Highway & Fuel Station Operator Europe · Germany

A9 Autobahn Fast-Charging Hub, Bavaria

AutoServ deployed eight 120-180 kW DC fast chargers on the A9 Autobahn, serving 420+ weekly sessions with 98.4% uptime in the first year.

8× 120–180 kW DC Charging Pile 2× 60–80 kW DC Charging Pile

Key Result

98.4% uptime · 420+ sessions/week · ROI reached in 26 months

Timeline

Q3 2023 · 10 weeks from RFQ to commissioning

Read Case Study

Planning an EV Charging Project?

Tell us your deployment scale, location, and application — we'll provide product recommendations, pricing, and certification documentation within 12 hours.

Discuss Your Project