Home / Projects

Project Case Studies

Real-world EV charging deployments across four continents — documented with installation details, charger specifications, and independently verified performance results.

Retail Parking EV Infrastructure: CityPark Shopping Centres, Amsterdam
🇳🇱
Retail Real Estate Europe · Netherlands

Retail Parking EV Infrastructure: CityPark Shopping Centres, Amsterdam

A Dutch retail property operator deployed 40 smart 22 kW AC chargers across two Amsterdam shopping centre car parks, recording 340+ sessions on peak days and a measurable 19% increase in shopper dwell time for EV-driving customers.

40× 22 kW AC Level 2 Charging Pile

Key Result

340+ peak-day sessions · 19% dwell time increase · tenant lease renewal contribution

Timeline

Q2 2024 · 12 weeks including tenant consultation

Read Case Study
Hotel Guest EV Charging Rollout: Landmark Hospitality Group, Dubai
🇦🇪
Hospitality Middle East · United Arab Emirates

Hotel Guest EV Charging Rollout: Landmark Hospitality Group, Dubai

A Dubai-based luxury hotel operator deployed 34 AC and DC chargers across three properties, achieving a 96% guest satisfaction score for charging provision and reducing energy cost per session through smart load balancing.

30× 22 kW AC Level 2 Wall Box 4× 60–80 kW DC Charging Pile

Key Result

96% guest satisfaction · 210+ sessions/week · 31% energy cost saving via load balancing

Timeline

Q1 2024 · 6 weeks installation across 3 properties

Read Case Study
Electric Fleet Depot Charging: BrightRoute Logistics, Bangkok Metropolitan Area
🇹🇭
Logistics & Fleet Southeast Asia · Thailand

Electric Fleet Depot Charging: BrightRoute Logistics, Bangkok Metropolitan Area

A Thai last-mile logistics operator electrified its Bangkok depot fleet with 56 AC and DC chargers, cutting energy costs per km by 38% and achieving 99.1% charger uptime over the first eight months of operation.

48× 7 kW AC Charging Pile 8× 20–40 kW DC Charging Pile

Key Result

99.1% uptime · 38% energy cost reduction · 1,440+ sessions/week

Timeline

Q4 2023 · 8 weeks from order to full commissioning

Read Case Study
Highway Fast-Charging Hub Deployment: A9 Autobahn Corridor, Bavaria
🇩🇪
Highway & Fuel Station Operator Europe · Germany

Highway Fast-Charging Hub Deployment: A9 Autobahn Corridor, Bavaria

AutoServ GmbH deployed eight 120–180 kW DC fast chargers across two rest-stop locations on the A9 Autobahn, serving 420+ charging sessions per week with 98.4% uptime across the first year of operation.

8× 120–180 kW DC Charging Pile 2× 60–80 kW DC Charging Pile

Key Result

98.4% uptime · 420+ sessions/week · ROI reached in 26 months

Timeline

Q3 2023 · 10 weeks from RFQ to commissioning

Read Case Study

Planning an EV Charging Project?

Tell us your deployment scale, location, and application — we'll provide product recommendations, pricing, and certification documentation within 12 hours.

Discuss Your Project